<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Field Notes</title><description>RSS feed</description><link>https://devsolder.com/</link><item><title>Transactional Outbox: Side Effects with the Business Write</title><link>https://devsolder.com/en/field-notes/transactional-outbox-side-effects/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/transactional-outbox-side-effects/</guid><description>When a business write must also send email, a webhook or an ERP push: write an outbox row in the same transaction; a relay delivers at least once.</description><pubDate>Sat, 24 Oct 2026 00:00:00 GMT</pubDate></item><item><title>EMC Pre-Compliance Testing Before the Lab: A Bench Plan</title><link>https://devsolder.com/en/field-notes/emc-pre-compliance-testing/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/emc-pre-compliance-testing/</guid><description>How to run EMC pre-compliance on a prototype: conducted and radiated scans, near-field probing, ESD checks, margins to the limit and when to book the lab.</description><pubDate>Thu, 22 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Webhook Idempotency and Retries: Keys, Windows, Side Effects</title><link>https://devsolder.com/en/field-notes/webhook-idempotency-retry-window/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/webhook-idempotency-retry-window/</guid><description>Webhook senders retry. How to pick an idempotency key, track processing state, keep dedup records past the retry window and run side effects once.</description><pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate></item><item><title>BLE and USB Device Protocol Design Notes</title><link>https://devsolder.com/en/field-notes/ble-usb-device-protocol-design/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/ble-usb-device-protocol-design/</guid><description>How we design a device protocol over BLE or USB: framing, versioning, commands, errors and a test harness, so app and firmware work run in parallel.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>BOM Risk Review and Component Lifecycle</title><link>https://devsolder.com/en/field-notes/bom-risk-component-lifecycle/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/bom-risk-component-lifecycle/</guid><description>How we review a BOM for sourcing risk: single-source parts, lifecycle status, alternates, long lead items and documentation, before the design is frozen.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Firmware OTA and Bootloader Design Notes</title><link>https://devsolder.com/en/field-notes/firmware-ota-bootloader-design/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/firmware-ota-bootloader-design/</guid><description>How we design a firmware update path: bootloader layout, image signing, A/B slots, rollback and power-loss handling, decided before the first unit ships.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Taking Over a Legacy Embedded Codebase</title><link>https://devsolder.com/en/field-notes/legacy-embedded-codebase-rescue/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/legacy-embedded-codebase-rescue/</guid><description>How we take over legacy embedded firmware: secure the assets, make the build reproducible, reproduce field faults, then fix what is safe first.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>DFM and DFT Checklist for PCB Handoff</title><link>https://devsolder.com/en/field-notes/pcb-dfm-dft-handoff-checklist/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/pcb-dfm-dft-handoff-checklist/</guid><description>What we check before a PCB goes to fabrication and assembly: DFM items, test access for bring-up and production, and the files a clean handoff needs.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Prototype Bring-up Procedure for New Boards</title><link>https://devsolder.com/en/field-notes/prototype-bring-up-procedure/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/prototype-bring-up-procedure/</guid><description>A staged bring-up procedure for new prototype boards: inspection, current-limited power, rails, clocks, debug link, peripherals and a findings log.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Evolving APIs for Mobile Apps and Partners: Versions, Compatibility and Retirement</title><link>https://devsolder.com/en/field-notes/api-versioning-mobile-partner-clients/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/api-versioning-mobile-partner-clients/</guid><description>Apps already installed and partner systems cannot upgrade with your server. Which changes are compatible, when to start a new version, and how to deprecate, measure usage per caller and retire old endpoints.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Integrating Orders with an ERP: Manual Review, Idempotent Pushes and a Sync Log</title><link>https://devsolder.com/en/field-notes/erp-order-sync-integration/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/erp-order-sync-integration/</guid><description>When an ordering or e-commerce platform feeds an ERP that still reviews orders by hand: how to design pushes, status polling, retries and reconciliation, and where troubleshooting starts.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Multi-Tenant SaaS: Data Isolation and Reseller Permission Hierarchies</title><link>https://devsolder.com/en/field-notes/multi-tenant-saas-isolation-hierarchy/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/multi-tenant-saas-isolation-hierarchy/</guid><description>Choosing between the three tenant isolation models, where tenant context must come from, how to model platform, reseller and sub-account permissions, and which tests to write first.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Shipping LLM Features: Versioned Prompts, Eval Sets and Regression Gates</title><link>https://devsolder.com/en/field-notes/llm-feature-prompt-versioning-evals/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/llm-feature-prompt-versioning-evals/</guid><description>Treat an LLM feature like any other software: prompts in the repo, output checked against a schema and rules, eval sets in CI, and a regression run on every prompt or model change.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Online Database Migrations: Expand, Then Contract, with a Clear Rollback Boundary</title><link>https://devsolder.com/en/field-notes/online-database-migration-expand-contract/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/online-database-migration-expand-contract/</guid><description>Changing schemas without downtime: expand-contract in separate releases, batched backfills, switching reads, migrations in CI, and the step after which rollback is no longer possible.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item><item><title>Integrating with Regulatory Reporting Interfaces: Mapping, Signing, Receipts and Resubmission</title><link>https://devsolder.com/en/field-notes/regulatory-reporting-gateway-integration/</link><guid isPermaLink="true">https://devsolder.com/en/field-notes/regulatory-reporting-gateway-integration/</guid><description>Reporting company data to a regulator&apos;s platform: mapping source data to each regulator&apos;s message format, signing and encryption, asynchronous receipts, retries, resubmission and an auditable record.</description><pubDate>Fri, 16 Oct 2026 00:00:00 GMT</pubDate></item></channel></rss>